News

LPG-C Gas Beauty

LPG-C Gas Beauty Suez Shipyard Company received LPG-C Gas Beauty which affiliated to Benelux-ship on the floating dock, which is 224.75 meters long, 34.20 meters wide with a capacity of 46773 tons

P.M.S 3308

P.M.S 3308 Suez Shipyard Company received P.M.S 3308 Unit Which Affiliated to the Petroleum Services Company on the dry dock which has a length of 67 meters long and 17 meters width with a capacity of 2266 tons , currently all the maintenance process are carried out for it .

AMINEH-M

AMINEH-M Suez Shipyard Company received at 3 AUG 2017  ( AMINEH-M ) ship Which Affiliated to El Amira For Maritime Agencies Company on the floating dock, which is 149 meters long, 23 meters wide with a capacity of 13781 tons to carry out the repair works for it .

PRIMAVERA II

PRIMAVERA II   Suez Shipyard Company received PRIMAVERA II vessel on the floating dock, which is 178.8 meters long, 16.5 meters wide with a capacity of 25982 tons , currently all the maintenance process are carried out for it

MASARRAH Vehicle

Suez Shipyard Company has received at 3 OCT 2017 MASARRAH Vehicle ,  AS The length of MASARRAH Vehicle is 129.5 meters and 20 meters width and G.T of 11495 ton which affiliated to Nama Shipping lines.  

PMS Abu Qir Tugboat

PMS Abu Qir Tugboat has entered which affiliated to Petroleum marine services Co. with 59 meters long and 15 meters width.  

Construction Project of Fiber Glass Factory

Construction Project of Fiber Glass Factory At 9/8/2017 Suez Shipyard Company has been implemented the project of the fiber glass factory for Suez Canal Authority in the company’s branch at Hod EL-Dars, with dimensions of 72 meters in length, 21 meters width and height of 13 meters. 120 tons of iron was used in the

News : Floating Dock

Floating Dock Suez shipyard finished the reforms of some vessels such as :   And for the first time in our shipyard, Floating Dock received the first dredger,,   the Chinese   DREDGER “ 215 GIN HUANG JUN” 3550 Tons – 113 M  Length. There are some Repair works for floating dock still carried out like: ADMARINE

News : Suez Canal Global Conference

        Suez shipyard chairman Eng. Essam Dabash showing our presentation Suez Shipyard Participated in “SCGC” Suez Canal Global Conference _ Challenges & Opportunities from 22 : 24 February 2016 Which augments the role of the SCA in supporting maritime transport and industry. It is an event where both local and international stakeholders and key players meet

News : Graven Dock

Graven Dock Suez shipyard finished the reforms of some vessels such as :   There are some repair works for graven dock still carried out like : MARIDIVE  V TAAWON    8

News : Syncrolift

Syncrolift Repair works for Syncrolift still carried out like, The TUGBOAT Abu Elhool TAAWON 11 ANCHOR Boat    G.T 240  Ton

New Buoys for New Suez Canal

Suez shipyard has built 6 New Buoys for New Suez Canal. This buoys used for New Suez canal to guide the ships passing the canal about canal Banks Boundary to avoid deviation of its course. The total weight of each Buoys is 10 Tons, each one has : Light tower Buoyancy cone Ballast weight pipe

News : Repairing Vessel "Taawon 11" in dry dock

Repairing Vessel “Taawon 11” in dry dock Dimensions Length                 55 M Breadth               18 M Draft                    6.5 M Scope of  work Remove Fouling . Sand blasting and painting . Steel Work Propeller and Rudder Maintenance

News : Repairing Vessel “Badr-1” in dry dock

Repairing Vessel “Badr-1” in dry dock Dimensions Length                 67.3 M Breadth               17 M Draft                    5.5 M Scope of  work Sand blasting and painting . Propeller  Maintenance Pipes Maintenance Valves Maintenance Chains Maintenance Bow 

Suez Shipyard Company received BRIDGE vessel

                      At 20 SEP 2017 Suez Shipyard Company received BRIDGE vessel on the floating dock. It Affiliated to Arab Bridge Maritime Company. BRIDGE is 121 meters long, 19.7 meters wide and GT of 7896.4 ton. Currently all the maintenance processes are carried out for it.

M 11 Barge

At 24 JUN 2018 , Suez shipyard has raised M 11 Barge of National Marine Dredging Co. on The Syncrolift, which is 24.8 meters long and 10.2 meters wide with G.T 420 Ton , currently all the maintenance process are carried out for it on the Syncrolift

GEEBO ELEMLAK BARGE

GEEBO ELEMLAK BARGE Suez shipyard Company received (GEEBO ELEMLAK BARGE), which affiliated to Rasheed Shipping Company on the dry dock. All the maintenance works has carried out on the BARGE, which is 75 meters long and 21 meters wide, including the work of painting, and changing pipes, iron and zinc

NEWS : MARLOG 5 CONFERENCE

Suez shipyard Participated in MARLOG 5 (International Maritime Transport and Logistics Conference) which was held in Alexandria from 13 : 15 March 2016