Building of Qantara floating Bridge

Building of Qantara floating Bridge
At 28 August 2017 ,  SUEZ SHIPYARD has been Building of Qantara floating Bridge , As All Pontoon sectors have been manufactured by 100% and its sides are being assembled on Pontoon base .

as The Pontoon of Qantara floating Bridge  with dimensions of 35 meters long and 15 meters width and about 170 tons of iron were used in its contracture with the approval of B.V authority. The work has been carried out in high quality according to the schedule